Our Multi-Stage Protocol
01
02
03
04
Raw Material Inspection
Inline Production Monitoring
Pre-Final & Final AQL
Container Loading Supervision
GSM testing, colorfastness, and dimensional stability checks on all incoming fabrics and trims before cutting.
Comprehensive inspection of finished garments, measurement verification, and packaging integrity prior to sealing.
Continuous AQL 2.5 audits during sewing to prevent defects and ensure adherence to tech pack specifications.
Final check of quantity, carton marking, and proper loading to ensure secure and compliant shipment.
Benchmarked for Excellence
Data-Driven Compliance
99.8%
On-Spec Production
0.5%
Acceptable Defect Rate
72 Hrs
Report Turnaround
Verify Our Rigor. Request Documentation.
Access detailed AQL checklists, sample audit reports, and our full quality governance framework.
